Tuesday, May 26, 2009

Girder sleeving




Girder sleeving 2nd floor GL(3-4,B-D) pipe chase 1 and 2

Thursday, May 21, 2009

Updated pic




installation of G.I. slip-on flange 6" on 150mm CWL g.i. Pipes in preparation for fitting of butterfly valve(normally closed) coming from filter tank GL(5,A) basement 1

Updated pic




-updated installation progress of 200 and 250mm geberit DP going to filter tank. GL(5,H) ground floor.

Tuesday, May 19, 2009

girder sleeving




Sleeving at pipechase #6 and 10 GL(3-4,H) 2nd floor

Clearance between black outs and columns




50mm clearance is observed between sleeves/black outs and slabs/columns

Sunday, May 17, 2009

Water line from storm drain filter tank going to underground tanks




Upper right hand corner is the black out for pipe coming from storm drain filter tank located at basment 1 GL(5,A) going down to underground non potable tanks.



Phenolic black out




Brusso safety shoes




P950 per pair. Nappa leather w/ oil resistant sole fully woven all thru out. Option of a softer insole for more comfort. For an additional of P40-45

Saturday, May 16, 2009

Pipe layouts w/ aid from nylon cords




Use of colored nylon cords (tansi) as basis for proper slope and alignment of pipes, hangers, and brackets.

geberit Pipe sleeves




-preparation of geberit pipes size 110(water closet),90(down spout),56(lavatory and floor drains)mm diameter arranged from right to left for sleeving in girder on 2nd floor

brackets




butane torch




Used in folding geberit pipe tips to prevent intentional/unintentional clogging..

Friday, May 15, 2009

Parcvue site (5/14/09)




Updated pic




Updated pic of revised layout for conflict between plumbing and fire pro lines at basement 1 GL(4-5,B-D)

Thursday, May 14, 2009

Transfer girder sleeving




sleeving for shower drain in transfer girder for 2nd floor unit H pipe chase #6 GL(3-4,F-H)

Chipping works




trench drain chipping works basement 1 GL(3-4,A-B)

Tuesday, May 12, 2009

fusion machine mounted on wider base




To minimize risk of fusion machine tilting over..

Wide base for fusion machine




Revised layout




Revised layout for conflict at basement 1 GL(4-5,B-D)

Monday, May 11, 2009

Equipment drain




Basement 1 GL(2-3,B-H)

Updated pic




Basement 1 GL(3-4,F-H)

Proposed solution to conflict posted earlier




Conflict between plumbing and fire pro lines




Conflict between geberit drain pipe and g.i. Pipes for fire pro(completed already) and waterline coming from water meter going down to underground potable tank(not yet competed). Location is on basement 1 GL(4-5,B-D)

Pipe rack




Located on basement 1 GL(1-2,E-F)

Pipe rack




Located at basement 1 level. line and grade e-1

Sunday, May 10, 2009

Wednesday, May 6, 2009

Sample of g.i. Welding works




Brackets




Brackets made of angle bars

Causes of damage




Removal of formworks from slab directly above causes damages to wrappenings done earlier

Parcvue hotel




Bracket for vertical g.i. Pipes 2

Parcvue hotel




bracket for vertical g.i. Pipe