Monday, September 28, 2009




updated pics of studor P.A.P.A. installation at 2nd floor(approved by Ottilie Marketing)





updated pics of brackets for soil/waste stacks inside pipe chase



mock up installation of sanitary and waterline lay out for typical TNB

hydrotest of waterline for common cr at basement 1 GL(1-2,A-B)

Saturday, September 19, 2009











mock up of revised 6 inch metal purlins installations for typical TNB:
concerns:
* as of yesterdays management meeting, thickness of metal purlins still questioned by ITI. the thickness approved was 0.8 but the 6 inch purlins used was only 0.5
* only sanitary lines were done because dry wall contractor didnt have hole saws w/ diameter size to suit the water lines.








this is the mock up approved by ITI for chipping of the zocalo..


Tuesday, September 15, 2009




Syphonic roof drain installation at the foor deck



Another suggestion is to chip the zocalo at the marked point in order to mount the angle bar bracket into the chipped portion of the zocalo and as a result the bracket will know be levelled to the height of the zocalo and not protruding.

Monday, September 14, 2009



Ed. Our consultant, engineer and foreman have come up with the suggestion to cut off the angle bar at the marked spot in order to give way for the installation of the fast wall. we are having difficulty of finding the rotary hammer/drill that is small enough to fit inside the pipe chase.. pls advise.. thx..


typical waterline bracket inside pipe chase

studor P.A.P.A. installation



Installation of studor P.A.P.A. at 2nd floor, unit K, pipe chase # 12, GL(4-5,D-E)