Tuesday, June 23, 2009

Updated pics




Updated pics of trench drain lay out located at basement 1 GL(4,A)

Friday, June 19, 2009

Updated pic




Updated layout at ground floor GL(1,H)

Updated pic




Updated layout at ground floor GL(1,H)

4th floor black out




Floor drain and pipe chase black out for typical TNB 4th floor

Wednesday, June 17, 2009

Updated pic




Updated downspout and drainpipe layout located at ground floor GL(5,H)

Updated pic




Updated downspout and drainpipe layout located at ground floor GL(5,H)

Equipment drain




56mm equipment drain located at ground floor GL(4,D-H)

Sunday, June 14, 2009




300mm drainpipes going to filter tank GL(3-5,A-B) ground floor



-shower drain and pipe chase black out for typical TNB 3rd floor

Thursday, June 11, 2009

Riser




100 and 80mm non potable and potable cold water riser from underground pump room going to elevated water tank. GL(3-4,C-D)

Riser




100 and 80mm non potable and potable cold water riser from underground pump room going to elevated water tank. GL(3-4,C-D)



300mm drainpipe going to filter tank located at ground floor Gl(4-5,B-C)

Saturday, June 6, 2009

Chipping works at main pipe chase




Located at ground floor level GL(3-4,C-D)

Chipping works at main pipe chase




Located at ground floor level GL(3-4,C-D)

Black out




Located at 2nd flr GL(3-4,B-D)

Black out




2nd floor GL(3-4,d)

Updated pic




250 mm geberit pipes going to public sewer line located at ground floor GL(3-5,A)

Monday, June 1, 2009

Updated pic




Girder sleeving 2nd floor GL(3-4,B-D) pipe chase 1 and 2

Drainage pipes going to sewer line




250mm geberit pipes going to sewer line located at ground floor GL(3-5,A)